Oakville Trafalgar Community Centre, Southeast Community Centre

Location: Oakville, Ontario

Project Type: 25-Metre Lap Pool, Leisure Pool

Client: Town of Oakville

Year Completed: 2020

Project Overview

Construction of a lap pool and leisure pool for a new community centre in Oakville. The redevelopment of the former Oakville Memorial Hospital site into a community centre will help keep local residents engaged and promote healthy living.

Project Details

Construction of a new 25 metre lap pool and a warm water leisure pool. Both pools are turnkey modular pool systems.

  • Modular stainless steel (316L) walls with Natatec commercial vinyl floor.
  • Pool mechanical system.
  • Overflow gutter systems on lap and leisure pools.
  • Installed
    – deck equipment
    – chlorine fill station and chlorine tank
    – UV units
    – pool deck tile and finishes

Special Features

  • Whale Tale spray feature
  • Chloramine removal system
  • Vacuum sand filtration with Gen II controls