Laurier Brantford YMCA

Location: Brantford, Ontario

Project Type: 25-Metre Lap Pool, Leisure Pool, Hot Tub

Client: Brantford, Ontario

Year Completed: 2018

Project Overview

Construction of a lap pool, leisure pool, and hot tub for a new YMCA facility in Brantford. With a collaboration between the local YMCA, Wilfred Laurier University, the city and private donors, the centre is truly a reflection of a community effort.

Project Details

Construction of a new traditional concrete 25 metre lap pool, warm water leisure pool, and hot pool.

  • Concrete pool structure with reinforcing steel
  • Full tile finishes in pools and pool decks
  • Overflow gutter system for lap pool and skimmer system for leisure pool
  • Installed
    – deck equipment
    – pool recirculation and mechanical systems
    – UV units

Special Features

  • Spray bar water feature
  • Sauna