loading

Oakville Trafalgar Community Centre, Southeast Community Centre

Oakville Trafalgar Community Centre, Southeast Community Centre

Oakville, Ontario

PROJECT OVERVIEW
Construction of a lap pool and leisure pool for a new community centre in Oakville. The redevelopment of the former Oakville Memorial Hospital site into a community centre will help keep local residents engaged and promote healthy living.

LOCATION: Oakville, Ontario

TYPE: 25-Metre Lap Pool, Leisure Pool

CLIENT: Town of Oakville

YEAR COMPLETED: FALL 2020

trafalgar-left1
trafalgar-left2

PROJECT DETAILS: Construction of a new 25 metre lap pool and a warm water leisure pool. Both pools are turnkey modular pool systems.

  • Modular stainless steel (316L) walls with Natatec commercial vinyl floor.
  • Pool mechanical system.
  • Overflow gutter systems on lap and leisure pools.
  • Installed
    – deck equipment
    – chlorine fill station and chlorine tank
    – UV units
    – pool deck tile and finishes

SPECIAL FEATURES:

  • Whale Tale spray feature
  • Chloramine removal system
  • Vacuum sand filtration with Gen II controls

Need more information?  We can help.

    Your message was sent successfully!

    Something went wrong, try refreshing and submitting the form again.






    Please prove you are human by selecting the Flag.